New Lawn Installation in Mississauga
For a yard with no lawn to remove. The ground is levelled and a new lawn is laid, typically in one day, at the lower of our two rates.
Bare ground, and a lawn to put on it
A new lawn starts from soil. There is no old turf to cut out and nothing to haul away, so the job is shorter than a replacement and costs less.
What the ground does need is preparing. Soil that has been driven over, dug up or left by a builder is rarely level and often thin. It is levelled first, topsoil goes down where it is needed, and the lawn is laid over the top. Nobody has to be home while that happens, as long as the crew can get to the yard.
Yards that start from soil
-
A new build
The house is finished and the yard is still soil.
-
An addition or a garage
The equipment has gone and left ruts where the lawn was.
-
A pool or a deck
The ground around it was dug, stockpiled and spread back.
-
A yard regraded for drainage
The slope has been corrected, and the surface is bare.
-
A lot left unfinished
The lawn was never laid, or was laid thin and never took.
What is there now, and what goes in
The first column is what the crew finds. The second is what they leave.
What is there now
-
Builder's soil
Often compacted by machinery and short of topsoil.
-
Ruts and low spots
Left by equipment, and by soil settling after it was moved.
-
Debris
Stones, offcuts and rubble near the surface are raked out.
What goes in
-
A level surface
The ground is levelled so the lawn sits even and water does not pool.
-
Topsoil where it is thin
Spread before the lawn goes down, so roots have soil to grow into.
-
Kentucky bluegrass
Premium turf, harvested fresh from Ontario sod farms.
-
The first watering
Done by the crew, with written guidelines for the 14 days after.
What a new lawn costs
The lower rate applies because nothing is torn out. At $1.25 per sq ft a yard passes the $1,200 minimum at about 960 sq ft; smaller yards are priced at the minimum. All prices are before HST.
Lawn replacement cost by lawn size$1.25 – $2.25
per sq ft for a new lawn on bare ground, before HST
Covers soil prep, labour and grass on ground that is already bare and prepared.
- A full lawn replacement
- $2.50 – $3.75+ per sq ft
- Minimum job
- $1,200
Canadian dollars, before HST.
Get a free lawn quoteHow long a new lawn takes
How long lawn replacement takes- 24–48 h
to a written quote
- 1
day of work
- 14
days of watering
- Day 15
the first mow
What to settle before the lawn goes in
Preparing your yard-
Other trades finished
Heavy equipment should be done in the yard before a lawn goes down on it.
-
The final grade set
If a builder or the city has to sign off the grading, have that done first.
-
A way in
Equipment needs a gate or opening at least 36 inches wide.
-
A way to water
A working tap and a hose that reaches every corner, from the first day.
Why use this service for a new lawn
-
Replacement is the whole job
One service, done from tear-out to first watering. There is no lawn care plan to sign up for.
-
Insured and WSIB-covered
Every crew carries WSIB coverage and liability insurance, as a condition of taking requests from this site.
-
One crew, one written price
Your request goes to a single local contractor, who sends one price in writing within 24 to 48 hours.
-
Guaranteed to establish
A 7-to-14-day establishment guarantee: dead sections are replaced free of charge when the written watering guidelines are followed.
Where we lay new lawns
All service areasNew lawn questions
All questionsCan a new lawn go straight onto builder's soil?
Only once it has been prepared. Ground left by a build is usually compacted and uneven. It is levelled first, and topsoil goes down where the soil is thin, so the roots have something to grow into. That preparation is part of the price.
How long does a new lawn take to lay?
Typically 1 day on bare, prepared ground, because there is no old lawn to tear out. The 14 days of daily watering afterwards are the same as for a replacement.
Why does a new lawn cost less than a replacement?
Because there is nothing to remove. A replacement includes tearing out and hauling away the old lawn, which a bare yard does not need. A new lawn on prepared ground is $1.25 to $2.25 per sq ft before HST. A replacement is $2.50 to $3.75+ per sq ft before HST.
Do you lay lawns for builders?
No. This service is for homeowners, one residential yard at a time. If you have bought a new home and the lawn was left to you, that is exactly the job.
Get a price for a new lawn
- Free, and in writing
- One insured, WSIB-covered crew
- A price within 24 to 48 hours
An old lawn in the way? That is lawn replacement.
Prefer to talk it through? Call (519) 635-4645